Public Water Partners

NONDALTON, AK · Lake and Peninsula Borough County

NONDALTON Water System

Consumer Confidence Report status

NONDALTON must publish a Consumer Confidence Report — the annual drinking water quality report covering calendar year 2026 — by July 1, 2027.

As of August 1, 2026, EPA's federal records show 2 items for NONDALTON that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.

Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed August 1, 2026. This is a record-keeping and public-information tool — it does not replace Alaska’s official records. Always confirm current status with Alaska before making decisions based on this information.

System facts

System ID (PWSID)
AK2260260
System type
Community Water System
Population served
205
Service connections
72
Ownership
Native American tribal
Water source
surface water (rivers, lakes, or reservoirs)

NONDALTON is one of 698 community water systems in Alaska in the 500 or fewer people size category, serving 205 people from surface water.

As of August 1, 2026, its federal record holds 915 entries between 1979 and 2026, of which 2 remain open; none are health-based.

Of the 915, 853 are monitoring and reporting requirements — the category that accounts for about four in five of all violations in EPA's national dataset — rather than findings about the water itself. The record involves synthetic organic chemicals, the Surface Water Treatment Rules, and volatile organic chemicals.

Violation history

  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2026 – January 31, 2026

    Archived
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    January 1, 2026 – January 31, 2026

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    December 1, 2025 – December 31, 2025

    Archived
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2025 – December 31, 2025

    Archived
  • Monitoring and Reporting (DBP)

    Chlorine

    December 1, 2025 – December 31, 2025

    Archived
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2025 – November 30, 2025

    Archived
  • Monitoring and Reporting (DBP)

    Chlorine

    November 1, 2025 – November 30, 2025

    Archived
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2025 – October 31, 2025

    Archived
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2025 – October 31, 2025

    Archived
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2025

    Unaddressed
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    October 1, 2025 – October 31, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    September 1, 2025 – September 30, 2025

    Archived
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    September 1, 2025 – September 30, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2025 – September 30, 2025

    Archived
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2025 – September 30, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2025 – July 31, 2025

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    July 1, 2025 – November 3, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2025 – July 31, 2025

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2025 – July 31, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    June 1, 2025 – June 30, 2025

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    June 1, 2025 – June 30, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2025 – June 30, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2025 – May 31, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    May 1, 2025 – May 31, 2025

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    May 1, 2025 – May 31, 2025

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2025 – May 31, 2025

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    April 1, 2025 – April 30, 2025

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2025 – March 31, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2025 – March 31, 2025

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Benzene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Toluene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Styrene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    Vinyl chloride

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2025 – December 31, 2025

    Archived
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2025 – January 31, 2025

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2025 – January 31, 2025

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    December 1, 2024 – December 31, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    December 1, 2024 – December 31, 2024

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2024 – December 31, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2024 – December 31, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    December 1, 2024 – December 31, 2024

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2024 – September 30, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    September 1, 2024 – September 30, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2024 – August 31, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2024 – July 31, 2024

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2024 – July 31, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2024 – July 31, 2024

    Resolved
  • Single Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2024 – July 31, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2024 – July 31, 2024

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    July 1, 2024 – August 28, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2024 – June 30, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2024 – June 30, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2024 – May 31, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2024 – May 31, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    April 1, 2024 – April 30, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2024 – April 30, 2024

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    January 1, 2024 – August 28, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2024 – February 21, 2024

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2024 – January 31, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2024 – January 31, 2024

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2023 – December 31, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    December 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2023 – November 30, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    November 1, 2023 – November 30, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2023 – November 30, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2023 – October 31, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2023 – October 31, 2023

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2023 – October 25, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    September 1, 2023 – September 30, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2023 – August 31, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2023 – July 31, 2023

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    July 1, 2023 – August 28, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    May 1, 2023 – May 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2023 – June 28, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2023 – February 28, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2023 – February 28, 2023

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Vinyl chloride

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2023 – December 31, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2022 – November 2, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2022 – December 31, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2022 – November 2, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    November 1, 2022 – November 30, 2022

    Resolved
  • Monitoring, Regular

    Dalapon

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Chlordane

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    2,4-D

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    LASSO

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Atrazine

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Carbofuran

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Dinoseb

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Picloram

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Simazine

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    OXAMYL

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Glyphosate

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Endothall

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Diquat

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Toxaphene

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Methoxychlor

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    October 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Endrin

    October 1, 2022 – December 31, 2022

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2022 – October 25, 2023

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    October 1, 2022 – October 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2022 – September 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2022 – August 31, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2022 – July 31, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2022 – July 31, 2022

    Resolved
  • Monitoring, Regular

    Endrin

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Dalapon

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Diquat

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Endothall

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Glyphosate

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    OXAMYL

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Simazine

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Picloram

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Dinoseb

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Carbofuran

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Atrazine

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    LASSO

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    July 1, 2022 – July 31, 2022

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 2022 – September 30, 2022

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2022 – July 27, 2023

    Resolved
  • Monitoring, Regular

    2,4-D

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    Chlordane

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    July 1, 2022 – September 30, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2022 – June 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2022 – June 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2022 – May 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    May 1, 2022 – May 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2022 – May 31, 2022

    Resolved
  • Monitoring, Regular

    Endrin

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    April 1, 2022 – April 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2022 – April 30, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    April 1, 2022 – April 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Diquat

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Methoxychlor

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Glyphosate

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Endothall

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Toxaphene

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Dalapon

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Chlordane

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    2,4-D

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    LASSO

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Atrazine

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Carbofuran

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Dinoseb

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Picloram

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    Simazine

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring, Regular

    OXAMYL

    April 1, 2022 – June 30, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    March 1, 2022 – March 31, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    February 1, 2022 – February 28, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2022 – February 28, 2022

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2022 – February 28, 2022

    Resolved
  • Monitoring, Regular

    Picloram

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Simazine

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    OXAMYL

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Glyphosate

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Endothall

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Diquat

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Dalapon

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Toxaphene

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Methoxychlor

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Endrin

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Vinyl chloride

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2022 – May 23, 2022

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2022 – December 31, 2022

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2022 – March 31, 2022

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    January 1, 2022 – August 28, 2024

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Chlordane

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    2,4-D

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Heptachlor

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    LASSO

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Atrazine

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Carbofuran

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Regular

    Dinoseb

    January 1, 2022 – March 31, 2022

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    December 1, 2021 – December 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2021 – December 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2021 – November 30, 2021

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    November 1, 2021 – November 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2021 – December 31, 2021

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2021 – October 25, 2023

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2021 – October 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2021 – October 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    September 1, 2021 – August 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2021 – September 30, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2021 – September 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    September 1, 2021 – August 31, 2022

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2021 – August 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2021 – August 31, 2021

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2021 – July 27, 2023

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2021 – July 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2021 – July 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2021 – June 30, 2021

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    June 1, 2021 – June 30, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2021 – June 30, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2021 – June 30, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2021 – March 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2021 – March 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2021 – February 28, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2021 – February 28, 2021

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Vinyl chloride

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2021 – December 31, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2021 – January 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2021 – January 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2020 – October 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2020 – October 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2020 – September 30, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    September 1, 2020 – August 31, 2021

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    September 1, 2020 – August 31, 2021

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2020 – August 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2020 – August 31, 2020

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2020 – September 30, 2020

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2020 – July 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2020 – June 30, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2020 – June 30, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2020 – May 31, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2020 – May 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2020 – April 30, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    April 1, 2020 – April 30, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2020 – March 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2020 – March 31, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2020 – February 29, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2020 – February 29, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2020 – January 31, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2020 – January 31, 2020

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2019 – December 31, 2019

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2019 – December 31, 2019

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2019 – November 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2019 – November 30, 2019

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2019 – July 7, 2020

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2019 – September 30, 2019

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    August 1, 2019 – August 31, 2019

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2019 – August 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2019 – September 30, 2019

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    July 1, 2019 – July 31, 2019

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2019 – July 31, 2019

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2019 – August 6, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2019 – June 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    May 1, 2019 – May 31, 2019

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    May 1, 2019 – May 31, 2019

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2019 – May 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    April 1, 2019 – June 30, 2019

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2018 – December 31, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2018 – December 31, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2018 – November 30, 2018

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    October 1, 2018 – October 31, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2018 – October 31, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2018 – September 30, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2018 – September 30, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2018 – August 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2018 – July 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    June 1, 2018 – June 30, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2018 – June 30, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2018 – May 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    April 1, 2018 – April 30, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2018 – April 30, 2018

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    April 1, 2018 – April 30, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    March 1, 2018 – March 31, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2018 – March 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2018 – February 28, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2018 – February 28, 2018

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    January 1, 2018 – January 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2018 – January 31, 2018

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2017 – December 31, 2017

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2017 – December 31, 2017

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2017 – November 30, 2017

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2017 – November 30, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    October 1, 2017 – October 31, 2017

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2017 – October 31, 2017

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2017 – October 31, 2017

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    September 1, 2017 – September 30, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2017 – September 30, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    August 1, 2017 – August 31, 2017

    Resolved
  • Monitoring, Source Water (LT2)

    Long Term 2 Enhanced Surface Water Treatment Rule

    July 2, 2017 – February 12, 2021

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2017 – July 31, 2017

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2017 – September 30, 2017

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    July 1, 2017 – July 31, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    June 1, 2017 – June 30, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    April 1, 2017 – April 30, 2017

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2017 – April 30, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    March 1, 2017 – March 31, 2017

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    November 1, 2016 – November 30, 2016

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    October 1, 2016 – October 31, 2016

    Resolved
  • Single Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2016 – October 31, 2016

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2016 – October 31, 2016

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    October 1, 2016 – June 28, 2017

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    September 1, 2016 – August 31, 2017

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2016 – September 30, 2016

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2016 – September 30, 2016

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2016 – September 30, 2016

    Resolved
  • Single Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2016 – August 31, 2016

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2016 – August 31, 2016

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    July 1, 2016 – June 28, 2017

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 2016 – January 31, 2016

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    December 1, 2015 – December 31, 2015

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2015 – December 31, 2015

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 2015 – December 31, 2015

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 2015 – November 30, 2015

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2015 – November 30, 2015

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2015 – November 30, 2015

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2015 – October 31, 2015

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2015 – October 31, 2015

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 2015 – October 31, 2015

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    October 1, 2015 – December 31, 2015

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    September 1, 2015 – September 30, 2015

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    August 1, 2015 – August 31, 2015

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2015 – August 31, 2015

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    March 1, 2015 – March 31, 2015

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2015 – February 28, 2015

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    February 1, 2015 – February 28, 2015

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    January 1, 2015 – January 31, 2015

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    January 1, 2015 – January 31, 2015

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    December 1, 2014 – December 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    December 1, 2014 – December 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    November 1, 2014 – November 30, 2014

    Resolved
  • Monthly Turbidity Exceed (Enhanced SWTR)

    Health-based

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2014 – November 30, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    October 1, 2014 – October 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2014 – September 30, 2014

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2014 – September 30, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    August 1, 2014 – August 31, 2014

    Resolved
  • Consumer Confidence Report Inadequate Reporting

    Consumer Confidence Rule

    July 2, 2014 – September 15, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    July 1, 2014 – July 31, 2014

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 2014 – July 31, 2014

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    July 1, 2014 – July 31, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    Chlorine

    July 1, 2014 – September 5, 2014

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    June 1, 2014 – June 30, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    June 1, 2014 – June 30, 2014

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 2014 – June 30, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    May 1, 2014 – May 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    April 1, 2014 – April 30, 2014

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2014 – March 31, 2014

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2014 – February 28, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    February 1, 2014 – February 28, 2014

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2014 – February 28, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    January 1, 2014 – August 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    January 1, 2014 – January 31, 2014

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    January 1, 2014 – August 31, 2014

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    December 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    November 1, 2013 – November 30, 2013

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    November 1, 2013 – November 30, 2013

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Endrin

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Methoxychlor

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Toxaphene

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Dalapon

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Diquat

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Endothall

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Glyphosate

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    OXAMYL

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Simazine

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Picloram

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Dinoseb

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Carbofuran

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Atrazine

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    LASSO

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    2,4-D

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    October 1, 2013 – October 31, 2013

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    October 1, 2013 – October 31, 2013

    Resolved
  • Monitoring, Regular

    Chlordane

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    October 1, 2013 – December 31, 2013

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2013 – September 30, 2013

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    September 1, 2013 – September 30, 2013

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    August 1, 2013 – August 31, 2013

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Chlordane

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    2,4-D

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    LASSO

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Atrazine

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Carbofuran

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Dinoseb

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Picloram

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Simazine

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    OXAMYL

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Glyphosate

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Dalapon

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Toxaphene

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Methoxychlor

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    Endrin

    July 1, 2013 – September 30, 2013

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Chlordane

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    2,4-D

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Endrin

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Dalapon

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Diquat

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Endothall

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Glyphosate

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    OXAMYL

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Simazine

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Picloram

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Dinoseb

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Carbofuran

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Atrazine

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    LASSO

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    April 1, 2013 – June 30, 2013

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    April 1, 2013 – June 30, 2013

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    March 1, 2013 – March 31, 2013

    Resolved
  • Treatment Technique (SWTR and GWR)

    Health-based

    Surface Water Treatment Rule

    February 1, 2013 – February 28, 2013

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2013 – February 28, 2013

    Resolved
  • Monitoring, Turbidity (Enhanced SWTR)

    Interim Enhanced Surface Water Treatment Rule

    February 1, 2013 – February 28, 2013

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Styrene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Vinyl chloride

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2013 – December 31, 2013

    Resolved
  • Monitoring, Regular

    Chlordane

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Heptachlor

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    LASSO

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Dinoseb

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    OXAMYL

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Glyphosate

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Endothall

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Diquat

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Regular

    Endrin

    January 1, 2013 – March 31, 2013

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 2012 – December 31, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    September 1, 2012 – September 30, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    August 1, 2012 – August 31, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    May 1, 2012 – May 31, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    April 1, 2012 – April 30, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    March 1, 2012 – March 31, 2012

    Resolved
  • Monitoring of Treatment (SWTR-Filter)

    Surface Water Treatment Rule

    February 1, 2012 – February 29, 2012

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    January 1, 2012 – December 31, 2012

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2011 – December 31, 2011

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Heptachlor

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Picloram

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    OXAMYL

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    Dinoseb

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    October 1, 2010 – December 31, 2010

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    September 1, 2010 – September 30, 2010

    Resolved
  • Monitoring, Repeat Major (TCR)

    Coliform (TCR)

    July 1, 2010 – July 31, 2010

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 2010 – June 30, 2010

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 2009 – November 30, 2009

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 2009 – July 31, 2009

    Resolved
  • Monitoring, Regular

    Arsenic

    July 1, 2009 – September 30, 2009

    Resolved
  • Monitoring, Regular

    Arsenic

    April 1, 2009 – June 30, 2009

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2009 – December 31, 2009

    Resolved
  • Monitoring, Regular

    Arsenic

    October 1, 2008 – December 31, 2008

    Resolved
  • Monitoring, Regular

    Arsenic

    July 1, 2008 – September 30, 2008

    Resolved
  • Monitoring, Regular

    Arsenic

    April 1, 2008 – June 30, 2008

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2007 – December 31, 2007

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 2006 – October 31, 2006

    Resolved
  • Consumer Confidence Report Complete Failure to Report

    Consumer Confidence Rule

    July 1, 2006 – November 5, 2010

    Resolved
  • Monitoring, Regular

    Arsenic

    January 1, 2006 – December 31, 2006

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2006 – December 31, 2006

    Resolved
  • Follow-up Or Routine LCR Tap M/R

    Lead and Copper Rule

    January 1, 2005

    Addressed
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    May 1, 2004 – May 31, 2004

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 2004 – December 31, 2004

    Resolved
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    January 1, 2002 – March 25, 2004

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 2001 – December 31, 2001

    Resolved
  • Monitoring, Routine Minor (TCR)

    Coliform (TCR)

    August 1, 2001 – August 31, 2001

    Resolved
  • Monitoring, Regular

    Dalapon

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Toxaphene

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    LASSO

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Atrazine

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Chlordane

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Glyphosate

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Heptachlor

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Picloram

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    July 1, 2001 – September 30, 2001

    Resolved
  • Monitoring, Repeat Minor (TCR)

    Coliform (TCR)

    July 1, 2001 – July 31, 2001

    Resolved
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    July 1, 2001 – March 25, 2004

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) phthalate

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Simazine

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Picloram

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    OXAMYL

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Heptachlor

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Glyphosate

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Endothall

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Diquat

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Endrin

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Dinoseb

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    1,2-DIBROMO-3-CHLOROPROPANE

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Dalapon

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Chlordane

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Atrazine

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    LASSO

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    2,4-D

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Toxaphene

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Methoxychlor

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    2,3,7,8-TCDD

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    April 1, 2001 – June 30, 2001

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Methoxychlor

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    2,4-D

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Atrazine

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Dalapon

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Endothall

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Heptachlor

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    OXAMYL

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Simazine

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Benzo(a)pyrene

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Di(2-ethylhexyl) adipate

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    HEXACHLOROBENZENE

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Regular

    Hexachlorocyclopentadiene

    January 1, 2001 – March 31, 2001

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    September 1, 2000 – September 30, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 2000 – August 31, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 2000 – July 31, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 2000 – June 30, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    May 1, 2000 – May 31, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 2000 – January 31, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 1999 – November 30, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 1999 – August 31, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1999 – July 31, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1999 – June 30, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    March 1, 1999 – March 31, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1999 – February 28, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1999 – January 31, 1999

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 1999 – December 31, 1999

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1998 – December 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 1998 – November 30, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 1998 – August 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1998 – July 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1998 – June 30, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    May 1, 1998 – May 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    April 1, 1998 – April 30, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    March 1, 1998 – March 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1998 – February 28, 1998

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 1998 – December 31, 1998

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1998 – January 31, 1998

    Resolved
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    Benzene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    trans-1,2-Dichloroethylene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    1,2-Dichloropropane

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    Xylenes, Total

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    1,1,2-Trichloroethane

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    CHLOROBENZENE

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    1,2,4-Trichlorobenzene

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Regular

    DICHLOROMETHANE

    January 1, 1998 – December 31, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1997 – December 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 1997 – October 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    September 1, 1997 – September 30, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 1997 – August 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1997 – July 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1997 – June 30, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    March 1, 1997 – March 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1997 – February 28, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1997 – January 31, 1997

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1996 – December 31, 1996

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1996 – July 31, 1996

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1996 – June 30, 1996

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1996 – February 29, 1996

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1996 – January 31, 1996

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 1995 – November 30, 1995

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Methoxychlor

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Toxaphene

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    2,4-D

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Simazine

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfoxide

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfone

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Atrazine

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Chlordane

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 1995 – October 31, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Diquat

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Dinoseb

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Endrin

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    October 1, 1995 – December 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    September 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Methoxychlor

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Toxaphene

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    2,4-D

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfoxide

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfone

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Atrazine

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Chlordane

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Endrin

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Dinoseb

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Diquat

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Picloram

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Regular

    Simazine

    July 1, 1995 – September 30, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1995 – July 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    2,4-D

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Endrin

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfoxide

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfone

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Chlordane

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    April 1, 1995 – April 30, 1995

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Dinoseb

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Atrazine

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Diquat

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Picloram

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Simazine

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Methoxychlor

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    Toxaphene

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    April 1, 1995 – June 30, 1995

    Resolved
  • Monitoring, Regular

    ETHYLENE DIBROMIDE

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Simazine

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Diquat

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Total Polychlorinated Biphenyls (PCB)

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Pentachlorophenol

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor epoxide

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Heptachlor

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Chlordane

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Atrazine

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Picloram

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfone

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb sulfoxide

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Aldicarb

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    2,4,5-TP

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    2,4-D

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Toxaphene

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    BHC-GAMMA

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Regular

    Methoxychlor

    January 1, 1995 – March 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1995 – January 31, 1995

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 1994 – November 30, 1994

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 1994 – October 31, 1994

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 1994 – August 31, 1994

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1994 – July 31, 1994

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    June 1, 1994 – June 30, 1994

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    May 1, 1994 – May 31, 1994

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1994 – February 28, 1994

    Archived
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    Toluene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    Nitrate

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    January 1, 1994 – January 31, 1994

    Archived
  • Monitoring, Regular

    Xylenes, Total

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    Tetrachloroethylene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    Ethylbenzene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    cis-1,2-Dichloroethylene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    o-Dichlorobenzene

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 1994 – December 31, 1994

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    December 1, 1993 – December 31, 1993

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    November 1, 1993 – November 30, 1993

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    October 1, 1993 – October 31, 1993

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    August 1, 1993 – August 31, 1993

    Archived
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    July 1, 1993 – January 10, 2000

    Resolved
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    July 1, 1993 – July 31, 1993

    Archived
  • Monitoring, Routine Major (TCR)

    Coliform (TCR)

    February 1, 1993 – February 28, 1993

    Archived
  • Monitoring, Regular

    Trichloroethylene

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    1,1-Dichloroethylene

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    Carbon tetrachloride

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    1,1,1-Trichloroethane

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    Vinyl chloride

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    p-Dichlorobenzene

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    Benzene

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    1,2-Dichloroethane

    January 1, 1992 – March 31, 1992

    Archived
  • Monitoring, Regular

    1,2-Dichloroethane

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    Benzene

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    Trichloroethylene

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    1,1-Dichloroethylene

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    Carbon tetrachloride

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    1,1,1-Trichloroethane

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    Vinyl chloride

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    p-Dichlorobenzene

    July 1, 1991 – September 30, 1991

    Resolved
  • Monitoring, Regular

    Fluoride

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Selenium

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Nitrate

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Mercury

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Chromium

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Cadmium

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Barium

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Arsenic

    February 28, 1990 – February 28, 1991

    Archived
  • Monitoring, Regular

    Chromium

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Fluoride

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Arsenic

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Mercury

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Nitrate

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Cadmium

    June 30, 1988 – June 30, 1989

    Archived
  • Monitoring, Regular

    Methoxychlor

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    BHC-GAMMA

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    2,4,5-TP

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    2,4-D

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    Endrin

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    Toxaphene

    June 30, 1986 – June 30, 1989

    Archived
  • Monitoring, Regular

    Gross Alpha, Excl. Radon and U

    June 30, 1985 – June 30, 1989

    Archived
  • Monitoring, Regular

    Fluoride

    October 1, 1979 – October 31, 1979

    Archived
  • Monitoring, Regular

    Mercury

    October 1, 1979 – October 31, 1979

    Archived

Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetAddressed corrective action reported, pending final confirmation

Enforcement actions

Common questions

Is NONDALTON required to publish a Consumer Confidence Report?

Yes. NONDALTON is a community water system, and federal rules (40 CFR 141 Subpart O) require every community water system to publish a Consumer Confidence Report each year.

When is NONDALTON’s next Consumer Confidence Report due?

NONDALTON’s next Consumer Confidence Report is due by July 1, 2027. The report covers calendar year 2026.

Does NONDALTON have any open drinking water violations on record?

As of August 1, 2026, EPA's federal records show 2 items for NONDALTON that are open and awaiting resolution. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings.

What is a Consumer Confidence Report?

A Consumer Confidence Report (CCR) is the annual drinking water quality report that community water systems must provide to the people they serve. It lists the contaminants detected in the system’s water during the year, where the water comes from, and how the results compare with federal limits. EPA’s revised CCR rule takes effect January 1, 2027, and the first reports in the new format are due July 1, 2027.

Contact

VAN DUSEN, DAVID

907-294-4017

NONDALTON, AK 99640