NAPASKIAK, AK · Bethel Census Area County
NAPASKIAK WEST WATER SYSTEM Water System
Current status
1 item on record is open and awaiting resolution as of July 4, 2026. None are health-based violations — open items of this kind are most often monitoring or reporting requirements, not water-safety findings. Full details are in the violation history below.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Alaska’s official records. Always confirm current status with Alaska before making decisions based on this information.
System facts
- System ID (PWSID)
- AK2260139
- System type
- Community Water System
- Population served
- 200
- Service connections
- 1
- Ownership
- Native American tribal
- Water source
- groundwater (wells)
Violation history
Monitoring and Reporting (DBP)
—Chlorine
December 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ArchivedPublic Notification Violation without NPDWR Violation
—Public Notice
November 1, 2025 – November 25, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2025 – November 30, 2025
ArchivedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025 – November 25, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2025 – August 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2025 – August 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2025 – July 31, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2025 – May 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
May 1, 2025 – May 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2025 – April 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
March 1, 2025 – March 31, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
February 1, 2025 – February 28, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2025 – February 28, 2025
ResolvedMonitoring, Regular
—Nitrate
January 1, 2025 – December 31, 2025
ArchivedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2024 – December 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
December 1, 2024 – December 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
November 1, 2024 – November 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2024 – August 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
August 1, 2024 – August 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2024 – May 31, 2024
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
April 14, 2024 – June 26, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
April 14, 2024 – October 23, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
April 14, 2024 – October 23, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
April 14, 2024 – October 23, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
April 14, 2024 – October 23, 2025
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2024 – April 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2024 – April 30, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2024 – March 31, 2024
ResolvedFailure to Consult with State
—Groundwater Rule
January 15, 2024 – June 26, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2024 – February 6, 2024
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2024
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2023 – November 21, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2023 – December 27, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2023 – October 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023 – October 21, 2023
ResolvedPublic Notification Violation without NPDWR Violation
—Public Notice
June 2, 2023 – February 13, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Regular
—Nitrate
January 1, 2023 – December 31, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2022 – November 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2022 – December 31, 2022
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – September 29, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2022 – April 30, 2022
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2021 – November 30, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2021 – December 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – July 14, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2021 – June 30, 2021
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2021 – June 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – January 31, 2021
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2021 – December 31, 2023
ArchivedMonitoring and Reporting (DBP)
—TTHM
January 1, 2021 – December 31, 2023
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2021 – March 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – November 30, 2020
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2020 – July 14, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – August 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2020 – June 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – April 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – February 29, 2020
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 31, 2020 – August 10, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 31, 2020 – August 8, 2022
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 31, 2020 – October 23, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 31, 2020 – October 23, 2025
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 31, 2020 – October 23, 2025
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2020 – March 31, 2020
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2020 – August 24, 2020
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2019 – November 1, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2019 – October 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2019 – September 30, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2019 – July 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2019 – September 30, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2019 – June 4, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2019 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2018 – November 7, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2018 – October 31, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2018 – August 31, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2018 – September 30, 2018
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2018 – May 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2018 – April 30, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2017 – November 30, 2017
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2017 – June 29, 2018
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2017 – October 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2017 – August 31, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2017 – September 30, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2017 – May 31, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2017 – June 30, 2017
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2017 – December 31, 2019
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2017 – December 31, 2019
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2017 – January 31, 2017
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2016 – December 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2016 – September 30, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2016 – July 31, 2016
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2016 – May 31, 2016
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2016 – October 3, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2016 – January 31, 2016
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2016 – March 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2015 – December 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2015 – October 31, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2015 – December 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2015 – September 30, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2015 – August 4, 2015
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2015 – June 30, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2015 – March 31, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2015 – February 28, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2014 – December 31, 2014
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2014 – December 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2014 – August 31, 2014
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
July 2, 2014 – February 8, 2017
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2014 – September 30, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2014 – July 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2014 – April 30, 2014
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2014 – May 20, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2014 – March 31, 2014
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2013 – September 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2013 – August 31, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2013 – July 31, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2013 – June 30, 2013
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2013 – April 30, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2013 – June 30, 2013
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2011 – June 9, 2011
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—p-Dichlorobenzene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—o-Dichlorobenzene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—DICHLOROMETHANE
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Xylenes, Total
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
October 1, 2010 – December 31, 2010
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Styrene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Benzene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—CHLOROBENZENE
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Tetrachloroethylene
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,2-Dichloropropane
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—Carbon tetrachloride
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—1,2-Dichloroethane
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
October 1, 2010 – December 31, 2010
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2009 – October 28, 2010
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2009 – December 31, 2009
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2009 – December 31, 2009
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
October 1, 2007 – October 31, 2007
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2007 – September 30, 2007
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2007 – March 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2006 – November 30, 2006
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2006 – October 31, 2006
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2006 – August 31, 2006
ArchivedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2006 – September 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2006 – May 31, 2006
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2006 – April 30, 2006
ArchivedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2006 – June 30, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2006 – March 31, 2006
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 2006 – February 28, 2006
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2006 – March 31, 2006
ResolvedMonitoring, Regular
—Nitrate
January 1, 2006 – December 31, 2006
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2006 – January 31, 2006
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2005 – December 31, 2005
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2005 – December 31, 2005
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2005 – September 30, 2005
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2005 – July 31, 2005
ArchivedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2005 – September 30, 2005
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2005 – September 30, 2005
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2005 – June 30, 2005
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2005 – March 31, 2005
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2004 – December 31, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2004 – December 31, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
October 1, 2004 – December 31, 2004
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2004 – September 30, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2004 – September 30, 2004
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – February 2, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2004 – June 30, 2004
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 2004 – May 31, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2004 – June 30, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2004 – June 30, 2004
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2004 – April 30, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
April 1, 2004 – June 30, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ArchivedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2004 – March 31, 2004
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2003 – October 31, 2003
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2003 – September 30, 2003
ArchivedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2003 – February 2, 2005
ResolvedMonitoring, Regular
—Nitrate
January 1, 2003 – December 31, 2003
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2002 – December 31, 2002
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2002 – February 8, 2005
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 2001 – November 6, 2001
ResolvedMonitoring, Regular
—Nitrate
January 1, 2001 – December 31, 2001
ResolvedMonitoring, Regular
—Nitrate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—CYANIDE
January 1, 1999 – December 31, 2001
ResolvedSanitary Survey (TCR)
—No contaminant on record
January 1, 1998 – December 31, 2002
ResolvedSanitary Survey (TCR)
—No contaminant on record
April 1, 1997 – March 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1995 – October 31, 1995
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1995 – April 30, 1995
ArchivedMonitoring, Regular
—Toluene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Styrene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrate
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—Benzene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1995 – December 31, 1995
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 1994 – July 31, 1994
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1994 – April 30, 1994
ArchivedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Nitrate
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Styrene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Regular
—Toluene
January 1, 1994 – December 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1993 – October 31, 1993
ArchivedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 1993 – December 14, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1993 – June 30, 1993
ArchivedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1993 – March 31, 1993
ArchivedMonitoring, Regular
—Barium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Arsenic
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Cadmium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Chromium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Mercury
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Selenium
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Fluoride
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrite
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Nitrate
January 1, 1993 – December 31, 1993
ResolvedMonitoring, Regular
—Benzene
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—Trichloroethylene
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—Carbon tetrachloride
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—Vinyl chloride
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—p-Dichlorobenzene
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—1,2-Dichloroethane
October 1, 1991 – December 31, 1991
ResolvedMonitoring, Regular
—Mercury
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Chromium
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Nitrate
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Selenium
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Arsenic
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Cadmium
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Fluoride
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Barium
September 1, 1989 – August 31, 1992
ArchivedMonitoring, Regular
—Barium
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Mercury
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Nitrate
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Selenium
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Fluoride
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Arsenic
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Cadmium
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Chromium
August 31, 1986 – August 31, 1989
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
June 30, 1985 – June 30, 1989
ArchivedMonitoring, Regular
—Selenium
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Fluoride
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Barium
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Chromium
October 1, 1979 – October 31, 1979
Archived
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2025 – December 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| December 1, 2025 – December 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Archived |
| November 1, 2025 – November 25, 2025 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| November 1, 2025 – November 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2025 – November 25, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2025 – May 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2025 – December 31, 2025 | Monitoring, Regular | Nitrate | — | Archived |
| December 1, 2024 – December 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2024 – November 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2024 – May 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 14, 2024 – June 26, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 14, 2024 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 14, 2024 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 14, 2024 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 14, 2024 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| April 1, 2024 – April 30, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2024 – April 30, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2024 – March 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 15, 2024 – June 26, 2025 | Failure to Consult with State | Groundwater Rule | — | Resolved |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – February 6, 2024 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2024 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Unaddressed |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2023 – November 21, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2023 – December 27, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2023 – October 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2023 – October 21, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 2, 2023 – February 13, 2024 | Public Notification Violation without NPDWR Violation | Public Notice | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – June 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – December 31, 2023 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2023 – March 31, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2022 – November 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – December 31, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2022 – September 29, 2022 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2022 – April 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2022 – June 30, 2022 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2021 – November 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – December 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2021 – July 14, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| June 1, 2021 – June 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2021 – June 30, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – January 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – December 31, 2023 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Archived |
| January 1, 2021 – December 31, 2023 | Monitoring and Reporting (DBP) | TTHM | — | Archived |
| January 1, 2021 – March 31, 2021 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2020 – November 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – July 14, 2021 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2020 – September 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2020 – August 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2020 – September 30, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| June 1, 2020 – June 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 31, 2020 – August 10, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 31, 2020 – August 8, 2022 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 31, 2020 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 31, 2020 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 31, 2020 – October 23, 2025 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – March 31, 2020 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2020 – August 24, 2020 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2019 – November 1, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2019 – October 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2019 – September 30, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – July 31, 2019 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2019 – September 30, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2019 – June 4, 2019 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2019 – December 31, 2019 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 2018 – November 7, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2018 – August 31, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2018 – September 30, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2018 – May 30, 2018 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2018 – April 30, 2018 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2017 – June 29, 2018 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2017 – October 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2017 – August 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2017 – September 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2017 – June 30, 2017 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2017 – December 31, 2019 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2017 – January 31, 2017 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2016 – December 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2016 – September 30, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2016 – July 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2016 – May 31, 2016 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2016 – October 3, 2016 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2016 – January 31, 2016 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2016 – March 31, 2016 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| December 1, 2015 – December 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2015 – October 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2015 – December 31, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| September 1, 2015 – September 30, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2015 – August 4, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2015 – June 30, 2015 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2015 – March 31, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2015 – February 28, 2015 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2014 – December 31, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| August 1, 2014 – August 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 2, 2014 – February 8, 2017 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – September 30, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2014 – July 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2014 – April 30, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2014 – May 20, 2014 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2014 – March 31, 2014 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2013 – September 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2013 – August 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2013 – July 31, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 2013 – June 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2013 – April 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2013 – June 30, 2013 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2011 – June 9, 2011 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Styrene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Benzene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| July 1, 2009 – October 28, 2010 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| October 1, 2007 – October 31, 2007 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2007 – September 30, 2007 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2007 – March 31, 2007 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| November 1, 2006 – November 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 2006 – December 31, 2006 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2006 – October 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| August 1, 2006 – August 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2006 – September 30, 2006 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| May 1, 2006 – May 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2006 – April 30, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2006 – June 30, 2006 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2006 – March 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| February 1, 2006 – February 28, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2006 – March 31, 2006 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2006 – December 31, 2006 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2006 – January 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| October 1, 2005 – December 31, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2005 – December 31, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| September 1, 2005 – September 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2005 – July 31, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2005 – September 30, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2005 – September 30, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| June 1, 2005 – June 30, 2005 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 2005 – March 31, 2005 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2004 – December 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| October 1, 2004 – December 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2004 – December 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| September 1, 2004 – September 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2004 – September 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| July 1, 2004 – February 2, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2004 – June 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| May 1, 2004 – May 31, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2004 – June 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| April 1, 2004 – June 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| April 1, 2004 – April 30, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 2004 – June 30, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| January 1, 2004 – March 31, 2004 | Monitoring and Reporting (DBP) | Chlorine | — | Archived |
| October 1, 2003 – October 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| September 1, 2003 – September 30, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2003 – February 2, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2003 – December 31, 2003 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2002 – December 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 2002 – February 8, 2005 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| July 1, 2001 – November 6, 2001 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 2001 – December 31, 2001 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1999 – December 31, 2001 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 1998 – December 31, 2002 | Sanitary Survey (TCR) | — | — | Resolved |
| April 1, 1997 – March 31, 2002 | Sanitary Survey (TCR) | — | — | Resolved |
| October 1, 1995 – October 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1995 – April 30, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1995 – December 31, 1995 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| July 1, 1994 – July 31, 1994 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Archived |
| April 1, 1994 – April 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1994 – December 31, 1994 | Monitoring, Regular | Toluene | — | Resolved |
| October 1, 1993 – October 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| July 1, 1993 – December 14, 1998 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| June 1, 1993 – June 30, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| March 1, 1993 – March 31, 1993 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Archived |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 1993 – December 31, 1993 | Monitoring, Regular | Nitrate | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | Benzene | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| October 1, 1991 – December 31, 1991 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Mercury | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Chromium | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Nitrate | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Selenium | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Arsenic | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Cadmium | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Fluoride | — | Archived |
| September 1, 1989 – August 31, 1992 | Monitoring, Regular | Barium | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Barium | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Mercury | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Nitrate | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Selenium | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Fluoride | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Arsenic | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Cadmium | — | Archived |
| August 31, 1986 – August 31, 1989 | Monitoring, Regular | Chromium | — | Archived |
| June 30, 1985 – June 30, 1989 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Selenium | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Fluoride | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Barium | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Chromium | — | Archived |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yet
Enforcement actions
- November 25, 2025State Compliance achieved2 linked violations
- November 7, 2025State Compliance Meeting conducted1 linked violation
- October 23, 2025State Compliance achieved4 linked violations
- October 23, 2025State Compliance achieved3 linked violations
- October 13, 2025State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 13, 2025State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- September 18, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 11, 2025State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 4, 2025State Compliance achieved8 linked violations
- January 3, 2025State Compliance achieved4 linked violations
- August 27, 2024State Compliance achieved1 linked violation
- June 20, 2024State Compliance achieved4 linked violations
- May 13, 2024State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- May 10, 2024State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 10, 2024State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- February 16, 2024State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- November 21, 2023State Compliance achieved1 linked violation
- July 20, 2023State Compliance achieved2 linked violations
- May 24, 2023State Compliance achieved3 linked violations
- May 19, 2023State Compliance Meeting conducted1 linked violation
- May 11, 2023State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- May 11, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- May 1, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 19, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 18, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 4, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 29, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- March 20, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 27, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 17, 2023State Compliance achieved3 linked violations
- September 29, 2022State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 10, 2022State Compliance achieved1 linked violation
- August 8, 2022State Compliance achieved1 linked violation
- July 7, 2022State Compliance achieved1 linked violation
- July 7, 2022State Compliance achieved3 linked violations
- January 17, 2022State Compliance achieved3 linked violations
- January 17, 2022State Compliance achieved1 linked violation
- September 23, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 16, 2021State Compliance achieved1 linked violation
- September 14, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 13, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 10, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 7, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 3, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 31, 2021State Compliance achieved19 linked violations
- August 31, 2021State Compliance achieved1 linked violation
- August 31, 2021State Compliance achieved4 linked violations
- July 14, 2021State Compliance achieved2 linked violations
- July 14, 2021State Compliance achieved1 linked violation
- July 14, 2021State Compliance achieved1 linked violation
- July 14, 2021State Compliance achieved1 linked violation
- June 10, 2021State Compliance Meeting conducted28 linked violations
- June 2, 2021State Compliance Meeting conducted20 linked violations
- May 26, 2021State Compliance Meeting conducted15 linked violations
- May 24, 2021State Compliance Meeting conducted15 linked violations
- February 9, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 26, 2020State Compliance achieved2 linked violations
- November 18, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 6, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 16, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 24, 2020State Compliance achieved1 linked violation
- August 14, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 27, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 22, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 17, 2020State Compliance achieved1 linked violation
- January 7, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 25, 2019State Compliance achieved3 linked violations
- November 1, 2019State Compliance achieved1 linked violation
- August 18, 2019State Compliance achieved1 linked violation
- June 4, 2019State Compliance achieved1 linked violation
- June 4, 2019State Compliance achieved1 linked violation
- December 27, 2018State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 7, 2018State Compliance achieved4 linked violations
- June 29, 2018State Compliance achieved2 linked violations
- May 30, 2018State Compliance achieved2 linked violations
- August 22, 2017State Compliance achieved3 linked violations
- February 8, 2017State Compliance achieved5 linked violations
- November 9, 2016State Compliance achieved1 linked violation
- November 9, 2016State Compliance achieved1 linked violation
- November 9, 2016State Compliance achieved1 linked violation
- October 3, 2016State Compliance achieved1 linked violation
- June 30, 2016State Compliance achieved1 linked violation
- March 15, 2016State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 4, 2016State Compliance achieved4 linked violations
- December 29, 2015State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 4, 2015State Compliance achieved11 linked violations
- November 25, 2014State Compliance achieved7 linked violations
- September 17, 2014State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 20, 2014State Compliance achieved4 linked violations
- May 5, 2014State Compliance achieved21 linked violations
- January 28, 2014State Compliance achieved11 linked violations
- December 6, 2013State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 20, 2013State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- May 20, 2013State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 14, 2013State Compliance achieved1 linked violation
- August 6, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- May 17, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 27, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 5, 2011State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 22, 2011State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 9, 2011State Compliance achieved2 linked violations
- May 17, 2011State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 17, 2011State Compliance achieved2 linked violations
- March 29, 2011State Compliance achieved21 linked violations
- January 25, 2011State Compliance achieved1 linked violation
- November 23, 2010State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 1, 2010State Compliance achieved2 linked violations
- October 28, 2010State Compliance achieved6 linked violations
- September 9, 2010State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 9, 2010State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 8, 2010State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 13, 2009State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 21, 2009State Compliance Meeting conducted1 linked violation
- July 24, 2009State Compliance Meeting conducted1 linked violation
- July 22, 2009State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 30, 2008State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 25, 2008State Compliance achieved17 linked violations
- January 28, 2008State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 11, 2008State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 23, 2007State Compliance Meeting conducted1 linked violation
- November 21, 2007State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 24, 2007State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 21, 2007State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- January 22, 2007State Violation/Reminder Notice3 linked violations
- October 17, 2006State Violation/Reminder Notice3 linked violations
- May 17, 2005State Violation/Reminder Notice56 linked violations
- April 14, 2004State Violation/Reminder Notice3 linked violations
- November 4, 2002State Violation/Reminder Notice42 linked violations
- April 30, 2002State Othergeneral compliance action — not tied to a specific violation on record
- April 22, 2002State Compliance Meeting conducted1 linked violation
- February 22, 2002State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 4, 2002State Othergeneral compliance action — not tied to a specific violation on record
- January 22, 2002State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 6, 2001State Othergeneral compliance action — not tied to a specific violation on record
- November 6, 2001State Compliance achieved3 linked violations
- October 23, 2001State Compliance Meeting conducted1 linked violation
- September 26, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 19, 2001State Compliance Meeting conducted3 linked violations
- August 27, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 25, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 23, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 25, 2001State Compliance Meeting conducted1 linked violation
- May 21, 2001State Compliance Meeting conducted1 linked violation
- May 14, 2001State Other1 linked violation
- April 23, 2001State Other1 linked violation
- April 11, 2001State Other1 linked violation
- April 6, 2001State Othergeneral compliance action — not tied to a specific violation on record
- February 21, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 5, 2001State Othergeneral compliance action — not tied to a specific violation on record
- January 22, 2001State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 18, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 7, 2000State Othergeneral compliance action — not tied to a specific violation on record
- November 21, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 25, 2000State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 28, 2000State Compliance achieved1 linked violation
- December 16, 1999State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 23, 1999State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 1, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 24, 1999State Othergeneral compliance action — not tied to a specific violation on record
- February 23, 1999State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 14, 1998State Compliance achieved10 linked violations
- December 9, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 8, 1998State Compliance achieved45 linked violations
- September 16, 1998State Othergeneral compliance action — not tied to a specific violation on record
- July 31, 1998State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 30, 1998State Othergeneral compliance action — not tied to a specific violation on record
- January 20, 1998State Other1 linked violation
- August 21, 1997State Other2 linked violations
- March 21, 1997State Othergeneral compliance action — not tied to a specific violation on record
- November 7, 1996State Othergeneral compliance action — not tied to a specific violation on record
- August 27, 1996State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- March 14, 1996State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 22, 1996State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 12, 1996State Othergeneral compliance action — not tied to a specific violation on record
- November 27, 1995State Other2 linked violations
- August 4, 1994State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 17, 1994State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 13, 1994State Violation/Reminder Notice1 linked violation
- October 26, 1993State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 5, 1993State Violation/Reminder Notice1 linked violation
- June 22, 1992State Othergeneral compliance action — not tied to a specific violation on record
- August 23, 1991State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- April 18, 1991State Violation/Reminder Notice1 linked violation
- April 19, 1989State Formal Notice of Violation issuedgeneral compliance action — not tied to a specific violation on record
- February 6, 1989State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
Contact
LARSON, WASSILENE
907-737-7643
NAPASKIAK, AK 99559