SOLDOTNA, AK · Kenai Peninsula Borough County
BAY VIEW TRAILER COURT Water System
Current status
1 open health-based violation on record as of July 4, 2026, alongside 3 other open item(s). See the violation history below for contaminant and status details.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace Alaska’s official records. Always confirm current status with Alaska before making decisions based on this information.
System facts
- System ID (PWSID)
- AK2241101
- System type
- Community Water System
- Population served
- 51
- Service connections
- 18
- Ownership
- privately owned
- Water source
- groundwater (wells)
Violation history
Monitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2025 – November 30, 2025
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2025
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2025 – September 30, 2025
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2025
UnaddressedLSL Inventory
Health-basedLEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedLSL Reporting
—LEAD AND COPPER RULE REVISIONS
October 17, 2024
UnaddressedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring, Regular
—Nitrate
January 1, 2024 – December 31, 2024
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2023 – November 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2023 – August 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2023 – July 31, 2023
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2023 – September 29, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2023 – June 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2023 – May 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2023 – April 30, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2023 – October 11, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2023 – January 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2022 – December 31, 2022
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2022 – September 29, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2022 – October 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2022 – September 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2022 – August 31, 2022
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2022 – September 29, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
June 1, 2022 – June 30, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2022 – May 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2022 – March 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2022 – February 28, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2022 – January 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2021 – December 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2021 – October 31, 2021
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2021 – November 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2021 – September 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2021 – August 31, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2021 – November 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2021 – July 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2021 – May 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2021 – April 30, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2021 – March 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2021 – February 28, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2021 – January 31, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
December 1, 2020 – December 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
November 1, 2020 – November 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
October 1, 2020 – October 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2020 – September 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
August 1, 2020 – August 31, 2020
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2020 – November 10, 2021
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
July 1, 2020 – July 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
May 1, 2020 – May 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
April 1, 2020 – April 30, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
March 1, 2020 – March 31, 2020
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2020 – February 29, 2020
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
January 1, 2020 – January 31, 2020
ResolvedMonitoring, Regular
—Nitrate
January 1, 2020 – December 31, 2020
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Toluene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Benzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2020 – December 31, 2022
ResolvedMonitoring, Regular
—Styrene
January 1, 2020 – December 31, 2022
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2019 – November 10, 2021
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2019 – November 10, 2021
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2019 – March 4, 2019
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2018 – March 4, 2019
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2018 – January 28, 2019
ResolvedMonitoring, Regular
—Nitrate
January 1, 2018 – December 31, 2018
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2017 – August 1, 2017
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 1, 2016 – September 29, 2017
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2016 – August 1, 2017
ResolvedSample Siting Plan Errors (RTCR)
—Revised Total Coliform Rule
April 1, 2016 – May 4, 2017
ResolvedMonitoring, Regular
—Nitrate
January 1, 2016 – December 31, 2016
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
November 21, 2015 – October 23, 2017
ResolvedSanitary Survey (TCR)
—No contaminant on record
September 19, 2015 – March 12, 2019
ResolvedConsumer Confidence Report Inadequate Reporting
—Consumer Confidence Rule
October 2, 2014 – October 26, 2015
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2014 – May 15, 2015
ResolvedMonitoring, Regular
—Toluene
January 1, 2014 – December 31, 2016
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2014 – May 1, 2017
ResolvedMonitoring, Regular
—Nitrate
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Arsenic
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Benzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Regular
—Styrene
January 1, 2014 – December 31, 2016
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2013 – April 30, 2013
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 11, 2013 – September 18, 2015
ResolvedFailure To Address Deficiency
Health-basedGroundwater Rule
January 11, 2013 – September 18, 2015
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2010 – December 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2010 – March 31, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2009 – August 15, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2008 – December 31, 2008
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2008 – December 31, 2016
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2008 – December 31, 2016
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2008 – December 31, 2016
ResolvedMonitoring, Regular
—Nitrate
January 1, 2008 – December 31, 2008
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2007 – July 23, 2007
ResolvedMonitoring, Regular
—Nitrate
January 1, 2007 – December 31, 2007
ResolvedSanitary Survey (TCR)
—No contaminant on record
November 29, 2006 – December 31, 2011
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2006 – December 31, 2006
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Arsenic
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Styrene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Toluene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Benzene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2005 – December 31, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2004 – December 31, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2003 – December 31, 2003
ResolvedMonitoring, Regular
—Barium
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Regular
—Selenium
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Regular
—Mercury
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Regular
—Fluoride
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Regular
—Chromium
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Regular
—Cadmium
January 1, 2002 – December 31, 2010
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2001 – June 30, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1995 – March 31, 1995
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1994 – December 31, 1994
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1994 – November 30, 1994
ResolvedMonitoring, Regular
—Fluoride
January 1, 1993 – December 31, 1995
ResolvedMonitoring, Regular
—Chromium
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Cadmium
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Arsenic
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Barium
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Fluoride
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Selenium
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Nitrate
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Mercury
November 30, 1987 – November 30, 1990
ArchivedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
June 30, 1985 – June 30, 1989
ArchivedMonitoring, Regular
—Selenium
October 1, 1979 – October 31, 1979
ArchivedMonitoring, Regular
—Chromium
October 1, 1979 – October 31, 1979
Archived
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| November 1, 2025 – November 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2025 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Unaddressed |
| September 1, 2025 – September 30, 2025 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2025 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Unaddressed |
| October 17, 2024 | LSL Inventory | LEAD AND COPPER RULE REVISIONS | Health-based | Unaddressed |
| October 17, 2024 | LSL Reporting | LEAD AND COPPER RULE REVISIONS | — | Unaddressed |
| January 1, 2024 – January 31, 2024 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2024 – December 31, 2024 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2023 – November 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – July 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2023 – September 29, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2023 – June 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2023 – May 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2023 – April 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – October 11, 2023 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2023 – January 31, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2022 – December 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2022 – September 29, 2023 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| October 1, 2022 – October 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2022 – September 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2022 – August 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2022 – September 29, 2023 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2022 – June 30, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2022 – May 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2022 – March 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2022 – February 28, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2022 – January 31, 2022 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2021 – December 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – October 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2021 – November 10, 2021 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| September 1, 2021 – September 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2021 – August 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2021 – November 10, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2021 – July 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2021 – May 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2021 – April 30, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2021 – March 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2021 – February 28, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2021 – January 31, 2021 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| December 1, 2020 – December 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| November 1, 2020 – November 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| October 1, 2020 – October 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| September 1, 2020 – September 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2020 – August 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| July 1, 2020 – November 10, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2020 – July 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| May 1, 2020 – May 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| April 1, 2020 – April 30, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| March 1, 2020 – March 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| February 1, 2020 – February 29, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – January 31, 2020 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2020 – December 31, 2020 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2020 – December 31, 2022 | Monitoring, Regular | Styrene | — | Resolved |
| October 1, 2019 – November 10, 2021 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2019 – November 10, 2021 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2019 – March 4, 2019 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2018 – March 4, 2019 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2018 – January 28, 2019 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2018 – December 31, 2018 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2017 – August 1, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| October 1, 2016 – September 29, 2017 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2016 – August 1, 2017 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| April 1, 2016 – May 4, 2017 | Sample Siting Plan Errors (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2016 – December 31, 2016 | Monitoring, Regular | Nitrate | — | Resolved |
| November 21, 2015 – October 23, 2017 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| September 19, 2015 – March 12, 2019 | Sanitary Survey (TCR) | — | — | Resolved |
| October 2, 2014 – October 26, 2015 | Consumer Confidence Report Inadequate Reporting | Consumer Confidence Rule | — | Resolved |
| July 1, 2014 – May 15, 2015 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2014 – May 1, 2017 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2014 – December 31, 2016 | Monitoring, Regular | Styrene | — | Resolved |
| April 1, 2013 – April 30, 2013 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 11, 2013 – September 18, 2015 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| January 11, 2013 – September 18, 2015 | Failure To Address Deficiency | Groundwater Rule | Health-based | Resolved |
| October 1, 2010 – December 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2010 – March 31, 2010 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2009 – August 15, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| October 1, 2008 – December 31, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2008 – December 31, 2016 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| January 1, 2008 – December 31, 2016 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2008 – December 31, 2016 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2008 – December 31, 2008 | Monitoring, Regular | Nitrate | — | Resolved |
| July 1, 2007 – July 23, 2007 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2007 – December 31, 2007 | Monitoring, Regular | Nitrate | — | Resolved |
| November 29, 2006 – December 31, 2011 | Sanitary Survey (TCR) | — | — | Resolved |
| October 1, 2006 – December 31, 2006 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2005 – December 31, 2007 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| October 1, 2004 – December 31, 2004 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2003 – December 31, 2003 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 2002 – December 31, 2010 | Monitoring, Regular | Cadmium | — | Resolved |
| June 1, 2001 – June 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1995 – March 31, 1995 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1994 – December 31, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1994 – November 30, 1994 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1993 – December 31, 1995 | Monitoring, Regular | Fluoride | — | Resolved |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Chromium | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Cadmium | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Arsenic | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Barium | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Fluoride | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Selenium | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Nitrate | — | Archived |
| November 30, 1987 – November 30, 1990 | Monitoring, Regular | Mercury | — | Archived |
| June 30, 1985 – June 30, 1989 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Selenium | — | Archived |
| October 1, 1979 – October 31, 1979 | Monitoring, Regular | Chromium | — | Archived |
Resolved addressed and confirmed by the stateUnaddressed no corrective action on record yetArchived closed in EPA's records (typically due to age or a data correction)
Enforcement actions
- December 30, 2025State Compliance achieved1 linked violation
- December 30, 2025State Compliance achieved1 linked violation
- October 6, 2025State Compliance achieved1 linked violation
- July 22, 2024State Violation/Reminder Notice80 linked violations
- February 28, 2024State Compliance achieved3 linked violations
- February 13, 2024State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- December 13, 2023State Compliance achieved21 linked violations
- November 6, 2023State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- October 11, 2023State Compliance achieved1 linked violation
- October 11, 2023State Compliance achieved10 linked violations
- September 29, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 29, 2023State Compliance achieved3 linked violations
- August 10, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 1, 2023State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 14, 2022State Compliance achieved3 linked violations
- August 1, 2022State Compliance achieved2 linked violations
- April 12, 2022State Compliance achieved9 linked violations
- December 9, 2021State Compliance achieved1 linked violation
- November 10, 2021State Compliance achieved5 linked violations
- November 4, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 4, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 2, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- November 2, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 17, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 12, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 23, 2021State Compliance achieved16 linked violations
- June 1, 2021State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 6, 2021State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- November 23, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 6, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- August 5, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- January 31, 2020State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 6, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- April 15, 2019State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- March 12, 2019State Compliance achieved1 linked violation
- March 4, 2019State Compliance achieved2 linked violations
- March 4, 2019State Compliance achieved1 linked violation
- February 26, 2019State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 7, 2019State Compliance achieved1 linked violation
- January 28, 2019State Compliance achieved2 linked violations
- October 23, 2017State Compliance achieved1 linked violation
- October 23, 2017State Compliance achieved12 linked violations
- October 23, 2017State Compliance achieved1 linked violation
- October 10, 2017State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- September 29, 2017State Compliance achieved1 linked violation
- August 1, 2017State Compliance achieved1 linked violation
- August 1, 2017State Compliance achieved1 linked violation
- May 4, 2017State Compliance achieved1 linked violation
- May 1, 2017State Compliance achieved1 linked violation
- February 14, 2017State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- February 6, 2017State Compliance achieved3 linked violations
- February 6, 2017State Compliance achieved23 linked violations
- January 12, 2017State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- October 26, 2015State Compliance achieved1 linked violation
- October 26, 2015State Compliance achieved1 linked violation
- September 18, 2015State Compliance achieved1 linked violation
- September 18, 2015State Compliance achieved1 linked violation
- August 3, 2015State Compliance achieved1 linked violation
- May 15, 2015State Compliance achieved1 linked violation
- October 23, 2014State Violation/Reminder Notice1 linked violation
- August 1, 2013State Compliance achieved2 linked violations
- July 2, 2013State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- June 24, 2013State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 17, 2013State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- June 14, 2013State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 13, 2013State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 11, 2013State Public Notification receivedgeneral compliance action — not tied to a specific violation on record
- June 11, 2013State Public Notification requestedgeneral compliance action — not tied to a specific violation on record
- June 11, 2013State Boil Water Ordergeneral compliance action — not tied to a specific violation on record
- January 9, 2013State Violation/Reminder Notice8 linked violations
- January 4, 2013State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- September 20, 2012State Compliance Meeting conductedgeneral compliance action — not tied to a specific violation on record
- July 12, 2012State Violation/Reminder Notice1 linked violation
- November 30, 2011State Violation/Reminder Notice12 linked violations
- November 1, 2011State Violation/Reminder Notice8 linked violations
- October 6, 2011State Compliance achieved6 linked violations
- September 1, 2011State Compliance achieved2 linked violations
- September 1, 2011State Violation/Reminder Notice1 linked violation
- August 30, 2011State Violation/Reminder Notice6 linked violations
- August 23, 2011State Violation/Reminder Notice6 linked violations
- August 15, 2011State Compliance achieved2 linked violations
- August 15, 2011State Compliance achieved1 linked violation
- April 7, 2011State Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 30, 2009State Compliance achieved3 linked violations
- March 25, 2008State Compliance achieved22 linked violations
- March 13, 2008State Violation/Reminder Notice23 linked violations
- January 24, 2008State Intentional no-action1 linked violation
- July 23, 2007State Compliance achieved1 linked violation
- March 9, 2007State Violation/Reminder Notice1 linked violation
- October 13, 2006State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 17, 2006State Compliance achieved1 linked violation
- April 10, 2006State Compliance achieved1 linked violation
- March 29, 2006State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 27, 2002State Other1 linked violation
- December 24, 2001State Othergeneral compliance action — not tied to a specific violation on record
- December 4, 2001State Other1 linked violation
- December 13, 2000State Othergeneral compliance action — not tied to a specific violation on record
- December 6, 1999State Other2 linked violations
- October 25, 1999State Other1 linked violation
- August 26, 1997State Othergeneral compliance action — not tied to a specific violation on record
- February 24, 1997State Othergeneral compliance action — not tied to a specific violation on record
- November 29, 1995State Violation/Reminder Notice1 linked violation
- November 27, 1995State Violation/Reminder Notice1 linked violation
- May 3, 1995State Violation/Reminder Notice4 linked violations
- October 29, 1993State Violation/Reminder Notice6 linked violations
- August 14, 1991State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- June 27, 1991State Violation/Reminder Notice8 linked violations
- November 9, 1990State Violation/Reminder Notice1 linked violation
- March 15, 1989State Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- October 7, 1987State Administrative/Compliance Order without penalty issued1 linked violation
Contact
EDWARDS, JERRY
907-690-6612
SOLDOTNA, AK 99669