Current status
No open violations on record as of July 4, 2026.
This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.
Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace EPA Region 9’s official records. Always confirm current status with EPA Region 9 before making decisions based on this information.
System facts
- System ID (PWSID)
- 090605033
- System type
- Community Water System
- Population served
- 76
- Service connections
- 24
- Ownership
- Native American tribal
- Water source
- surface water (rivers, lakes, or reservoirs)
Violation history
Monitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2025 – December 31, 2025
ArchivedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2025 – October 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2025 – September 30, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2025 – August 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2025 – July 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2025 – April 30, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2025 – March 31, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2025 – February 28, 2025
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2025 – January 31, 2025
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
December 1, 2024 – December 31, 2024
ResolvedMonthly Turbidity Exceed (Enhanced SWTR)
Health-basedInterim Enhanced Surface Water Treatment Rule
November 1, 2024 – November 30, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2024 – October 31, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2024 – September 30, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2024 – August 31, 2024
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2024 – December 12, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2024 – June 30, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2024 – May 31, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2024 – March 31, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2024 – February 29, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2024 – January 31, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2023 – December 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
September 1, 2023 – September 30, 2023
ResolvedPublic Notification Violation for NPDWR Violation
—Public Notice
August 1, 2023 – December 12, 2024
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2023 – August 31, 2023
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
August 1, 2023 – August 22, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
July 1, 2023 – September 30, 2023
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2023 – March 31, 2023
ResolvedMonitoring, Routine (RTCR)
—Revised Total Coliform Rule
February 1, 2023 – February 28, 2023
ResolvedMonitoring and Reporting (DBP)
—Chlorine
January 1, 2023 – March 22, 2023
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2019 – March 31, 2019
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
February 1, 2019 – February 28, 2019
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2019 – January 31, 2019
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2018 – December 31, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2018 – November 30, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2018 – October 31, 2018
ResolvedTreatment Technique No Certif. Operator
Health-basedStage 1 Disinfectants and Disinfection Byproducts Rule
June 1, 2018 – March 15, 2019
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2018 – June 30, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2018 – May 31, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2018 – April 30, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2018 – March 31, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2018 – February 28, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2018 – January 31, 2018
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2017 – December 31, 2017
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2017 – November 30, 2017
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2017 – October 31, 2017
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2017 – June 30, 2017
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2017 – May 31, 2017
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2017 – April 30, 2017
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2017 – October 19, 2020
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2015 – September 30, 2015
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2015 – August 31, 2015
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2015 – July 31, 2015
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
June 1, 2015 – June 30, 2015
ResolvedMonitoring, Routine (IDSE)
—Total Haloacetic Acids (HAA5)
January 1, 2015 – December 31, 2015
ResolvedMonitoring, Routine (IDSE)
—TTHM
January 1, 2015 – December 31, 2015
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2014 – December 31, 2014
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2014 – November 30, 2014
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2014 – October 31, 2014
ResolvedMonitoring and Reporting (DBP)
—Total Haloacetic Acids (HAA5)
January 1, 2014 – December 31, 2014
ResolvedMonitoring and Reporting (DBP)
—TTHM
January 1, 2014 – December 31, 2014
ResolvedMonitoring, Regular
—Nitrate
January 1, 2013 – December 31, 2013
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2011 – June 30, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2011 – May 31, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2011 – April 30, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2011 – March 31, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2011 – February 28, 2011
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Toxaphene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Dalapon
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Diquat
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Endothall
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Glyphosate
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—OXAMYL
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Simazine
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Endrin
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Picloram
January 1, 2011 – December 31, 2013
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2011 – January 31, 2011
ResolvedMonitoring, Regular
—Dinoseb
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Carbofuran
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Atrazine
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—LASSO
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Heptachlor
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—2,4-D
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Chlordane
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Styrene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Toluene
January 1, 2011 – December 31, 2013
ResolvedMonitoring, Regular
—Benzene
January 1, 2011 – December 31, 2013
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2010 – December 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2010 – November 30, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2010 – October 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2010 – September 30, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2010 – August 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2010 – July 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2010 – June 30, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2010 – May 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2010 – April 30, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2010 – March 31, 2010
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
March 1, 2010 – March 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2010 – February 28, 2010
ResolvedTreatment Technique (SWTR and GWR)
Health-basedSurface Water Treatment Rule
February 1, 2010 – February 28, 2010
ResolvedFollow-up Or Routine LCR Tap M/R
—Lead and Copper Rule
January 1, 2010 – February 22, 2011
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2010 – January 31, 2010
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2009 – December 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2009 – November 30, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2009 – October 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2009 – September 30, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2009 – August 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 2009 – July 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 2009 – June 30, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2009 – May 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2009 – April 30, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2009 – March 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2009 – February 28, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2009 – January 31, 2009
ResolvedMonitoring, Regular
—Nitrate
January 1, 2009 – December 31, 2009
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2008 – December 31, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2008 – November 30, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2008 – October 31, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
July 1, 2008 – September 30, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
April 1, 2008 – June 30, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 2008 – April 30, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
April 1, 2008 – June 30, 2008
ResolvedMonitoring, Regular
—Combined Uranium
April 1, 2008 – June 30, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2008 – March 31, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2008 – February 29, 2008
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
January 1, 2008 – March 31, 2008
ResolvedMonitoring, Regular
—Combined Uranium
January 1, 2008 – March 31, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2008 – January 31, 2008
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
January 1, 2008 – March 31, 2008
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 2007 – December 31, 2007
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 2007 – November 30, 2007
ResolvedMonitoring, Regular
—Combined Uranium
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Combined Radium (-226 and -228)
October 1, 2007 – December 31, 2007
ResolvedMonitoring, Regular
—Gross Alpha, Excl. Radon and U
October 1, 2007 – December 31, 2007
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 2007 – October 31, 2007
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 2007 – September 30, 2007
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 2007 – August 31, 2007
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 2006 – May 31, 2006
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 2006 – March 31, 2006
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 2006 – February 28, 2006
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 2006 – January 31, 2006
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 2005 – August 31, 2005
ResolvedMonitoring, Repeat Minor (TCR)
—Coliform (TCR)
July 1, 2005 – July 31, 2005
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2004 – August 31, 2005
ResolvedMonitoring, Regular
—Barium
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Arsenic
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Mercury
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Nitrate
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Fluoride
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Selenium
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—CYANIDE
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Regular
—Chromium
January 1, 2004 – December 31, 2004
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 2002 – November 30, 2002
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 2002 – October 31, 2002
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
September 1, 2002 – September 30, 2002
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2002 – August 31, 2005
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
June 1, 2002 – June 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 2002 – April 30, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 2002 – March 31, 2002
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
February 1, 2002 – February 28, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 2002 – January 31, 2002
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 2001 – December 31, 2001
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
November 1, 2001 – November 30, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 2001 – October 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 2001 – September 30, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 2001 – August 31, 2001
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 2001 – July 31, 2001
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2001 – August 31, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 2001 – June 30, 2001
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
March 1, 2001 – March 31, 2001
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
October 1, 2000 – October 31, 2000
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 2000 – September 30, 2000
ResolvedConsumer Confidence Report Complete Failure to Report
—Consumer Confidence Rule
July 1, 2000 – August 31, 2005
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
July 1, 2000 – July 31, 2000
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
May 1, 2000 – May 31, 2000
ResolvedMaximum Contaminant Level Violation, Acute (TCR)
Health-basedColiform (TCR)
March 1, 2000 – March 31, 2000
ResolvedMonitoring, Regular
—Nitrate
January 1, 2000 – December 31, 2000
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 1999 – December 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 1999 – November 30, 1999
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
October 1, 1999 – October 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 1999 – October 31, 1999
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
September 1, 1999 – September 30, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 1999 – September 30, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 1999 – August 31, 1999
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
July 1, 1999 – July 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 1999 – July 31, 1999
ResolvedMaximum Contaminant Level Violation, Monthly (TCR)
Health-basedColiform (TCR)
June 1, 1999 – June 30, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 1999 – June 30, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1999 – May 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 1999 – May 31, 1999
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1999 – April 30, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 1999 – April 30, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 1999 – March 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 1999 – February 28, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 1999 – January 31, 1999
ResolvedMonitoring, Regular
—Toluene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—CHLOROBENZENE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Ethylbenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Tetrachloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Styrene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1,2-Trichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Trichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2-Dichloropropane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Carbon tetrachloride
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1,1-Trichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2-Dichloroethane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—trans-1,2-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,1-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Vinyl chloride
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—p-Dichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—o-Dichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—DICHLOROMETHANE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Chlordane
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Xylenes, Total
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Selenium
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—cis-1,2-Dichloroethylene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—1,2,4-Trichlorobenzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Nitrate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—2,4-D
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Heptachlor
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Mercury
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Fluoride
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—LASSO
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Atrazine
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Carbofuran
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Endrin
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—CYANIDE
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Chromium
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Picloram
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Simazine
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Cadmium
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—OXAMYL
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Glyphosate
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Endothall
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Diquat
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Barium
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Benzene
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Arsenic
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Dalapon
January 1, 1999 – December 31, 1999
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1999 – December 31, 1999
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 1998 – December 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1998 – December 31, 1998
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
November 1, 1998 – November 30, 1998
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
November 1, 1998 – November 30, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 1998 – November 30, 1998
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
October 1, 1998 – October 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 1998 – October 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 1998 – September 30, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1998 – September 30, 1998
ResolvedMonitoring, Routine Minor (TCR)
—Coliform (TCR)
August 1, 1998 – August 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 1998 – August 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1998 – July 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 1998 – July 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 1998 – June 30, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1998 – June 30, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 1998 – May 31, 1998
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 1998 – May 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1998 – April 30, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 1998 – April 30, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1998 – March 31, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 1998 – March 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1998 – February 28, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 1998 – February 28, 1998
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 1998 – January 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1998 – January 31, 1998
ResolvedMonitoring, Regular
—Chlordane
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—ETHYLENE DIBROMIDE
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—1,2-DIBROMO-3-CHLOROPROPANE
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Total Polychlorinated Biphenyls (PCB)
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Pentachlorophenol
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Benzo(a)pyrene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—HEXACHLOROBENZENE
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—2,4,5-TP
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—2,4-D
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Heptachlor epoxide
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Heptachlor
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—LASSO
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Atrazine
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Carbofuran
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Hexachlorocyclopentadiene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Dinoseb
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Picloram
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) phthalate
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Simazine
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—OXAMYL
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Di(2-ethylhexyl) adipate
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Glyphosate
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Endothall
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Diquat
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Dalapon
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Toxaphene
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Methoxychlor
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—BHC-GAMMA
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Endrin
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Thallium, Total
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Beryllium, Total
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Antimony, Total
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Selenium
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Nitrite
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Nitrate
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Mercury
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Fluoride
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—CYANIDE
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Chromium
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Cadmium
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Barium
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Regular
—Arsenic
January 1, 1998 – December 31, 1998
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1997 – December 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
December 1, 1997 – December 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1997 – November 30, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
November 1, 1997 – November 30, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
October 1, 1997 – October 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1997 – October 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
September 1, 1997 – September 30, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1997 – September 30, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
August 1, 1997 – August 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1997 – August 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1997 – July 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
July 1, 1997 – July 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1997 – June 30, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
June 1, 1997 – June 30, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1997 – May 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
May 1, 1997 – May 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1997 – April 30, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
April 1, 1997 – April 30, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1997 – March 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
March 1, 1997 – March 31, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
February 1, 1997 – February 28, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1997 – February 28, 1997
ResolvedMonitoring of Treatment (SWTR-Filter)
—Surface Water Treatment Rule
January 1, 1997 – January 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1997 – January 31, 1997
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1996 – December 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1996 – November 30, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1996 – October 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1996 – September 30, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1996 – August 31, 1996
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
July 1, 1996 – February 4, 2005
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1996 – June 30, 1996
ResolvedMonitoring, Repeat Major (TCR)
—Coliform (TCR)
May 1, 1996 – May 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1996 – April 30, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
March 1, 1996 – March 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
February 1, 1996 – February 29, 1996
ResolvedMonitoring, Regular
—Asbestos
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Mercury
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Cadmium
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Nitrate-Nitrite
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Nitrate
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Barium
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1996 – January 31, 1996
ResolvedMonitoring, Regular
—Fluoride
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Selenium
January 1, 1996 – December 31, 1996
ResolvedInitial Tap Sampling for Pb and Cu
—Lead and Copper Rule
January 1, 1996 – February 4, 2005
ResolvedMonitoring, Regular
—Chromium
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Regular
—Arsenic
January 1, 1996 – December 31, 1996
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
September 1, 1992 – September 30, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
August 1, 1992 – August 31, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
July 1, 1992 – July 31, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1992 – June 30, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
May 1, 1992 – May 31, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
April 1, 1992 – April 30, 1992
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1992 – March 31, 1992
ResolvedFailure to Filter (SWTR)
Health-basedSurface Water Treatment Rule
January 1, 1992 – March 23, 2007
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
December 1, 1991 – December 31, 1991
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
November 1, 1991 – November 30, 1991
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
October 1, 1991 – October 31, 1991
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
June 1, 1991 – June 30, 1991
ResolvedMonitoring, Routine Major (TCR)
—Coliform (TCR)
January 1, 1991 – January 31, 1991
Resolved
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
| Period | Violation | Contaminant / rule | Health-based | Status |
|---|---|---|---|---|
| December 1, 2025 – December 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Archived |
| October 1, 2025 – October 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2025 – September 30, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2025 – August 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2025 – July 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2025 – April 30, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2025 – March 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2025 – February 28, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2025 – January 31, 2025 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2024 – December 31, 2024 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| November 1, 2024 – November 30, 2024 | Monthly Turbidity Exceed (Enhanced SWTR) | Interim Enhanced Surface Water Treatment Rule | Health-based | Resolved |
| October 1, 2024 – October 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2024 – September 30, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2024 – August 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2024 – December 12, 2024 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2024 – June 30, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2024 – May 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2024 – March 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2024 – February 29, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2024 – January 31, 2024 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2023 – December 31, 2023 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2023 – September 30, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| August 1, 2023 – December 12, 2024 | Public Notification Violation for NPDWR Violation | Public Notice | — | Resolved |
| August 1, 2023 – August 31, 2023 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2023 – August 22, 2023 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| July 1, 2023 – September 30, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2023 – March 31, 2023 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2023 – February 28, 2023 | Monitoring, Routine (RTCR) | Revised Total Coliform Rule | — | Resolved |
| January 1, 2023 – March 22, 2023 | Monitoring and Reporting (DBP) | Chlorine | — | Resolved |
| March 1, 2019 – March 31, 2019 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2019 – February 28, 2019 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2019 – January 31, 2019 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2018 – December 31, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2018 – November 30, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2018 – October 31, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2018 – March 15, 2019 | Treatment Technique No Certif. Operator | Stage 1 Disinfectants and Disinfection Byproducts Rule | Health-based | Resolved |
| June 1, 2018 – June 30, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2018 – May 31, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2018 – April 30, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2018 – March 31, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2018 – February 28, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2018 – January 31, 2018 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2017 – December 31, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2017 – November 30, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2017 – October 31, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2017 – June 30, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2017 – May 31, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2017 – April 30, 2017 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2017 – October 19, 2020 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| September 1, 2015 – September 30, 2015 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2015 – August 31, 2015 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2015 – July 31, 2015 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2015 – June 30, 2015 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2015 – December 31, 2015 | Monitoring, Routine (IDSE) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2015 – December 31, 2015 | Monitoring, Routine (IDSE) | TTHM | — | Resolved |
| December 1, 2014 – December 31, 2014 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2014 – November 30, 2014 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2014 – October 31, 2014 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring and Reporting (DBP) | Total Haloacetic Acids (HAA5) | — | Resolved |
| January 1, 2014 – December 31, 2014 | Monitoring and Reporting (DBP) | TTHM | — | Resolved |
| January 1, 2013 – December 31, 2013 | Monitoring, Regular | Nitrate | — | Resolved |
| June 1, 2011 – June 30, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2011 – May 31, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2011 – April 30, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2011 – March 31, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2011 – February 28, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 2011 – January 31, 2011 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 2011 – December 31, 2013 | Monitoring, Regular | Benzene | — | Resolved |
| December 1, 2010 – December 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2010 – November 30, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2010 – October 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2010 – September 30, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2010 – August 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2010 – July 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2010 – June 30, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2010 – May 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2010 – April 30, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2010 – March 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2010 – March 31, 2010 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| February 1, 2010 – February 28, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2010 – February 28, 2010 | Treatment Technique (SWTR and GWR) | Surface Water Treatment Rule | Health-based | Resolved |
| January 1, 2010 – February 22, 2011 | Follow-up Or Routine LCR Tap M/R | Lead and Copper Rule | — | Resolved |
| January 1, 2010 – January 31, 2010 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 2009 – December 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2009 – November 30, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2009 – October 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2009 – September 30, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2009 – August 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2009 – July 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 2009 – June 30, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2009 – May 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2009 – April 30, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2009 – March 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2009 – February 28, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2009 – January 31, 2009 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2009 – December 31, 2009 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 2008 – December 31, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2008 – November 30, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2008 – October 31, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2008 – September 30, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 2008 – September 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2008 – June 30, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| April 1, 2008 – April 30, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 2008 – June 30, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| April 1, 2008 – June 30, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| March 1, 2008 – March 31, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2008 – February 29, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Combined Uranium | — | Resolved |
| January 1, 2008 – January 31, 2008 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2008 – March 31, 2008 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| December 1, 2007 – December 31, 2007 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 2007 – November 30, 2007 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Combined Uranium | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Combined Radium (-226 and -228) | — | Resolved |
| October 1, 2007 – December 31, 2007 | Monitoring, Regular | Gross Alpha, Excl. Radon and U | — | Resolved |
| October 1, 2007 – October 31, 2007 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 2007 – September 30, 2007 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2007 – August 31, 2007 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 2006 – May 31, 2006 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 2006 – March 31, 2006 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 2006 – February 28, 2006 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 2006 – January 31, 2006 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 2005 – August 31, 2005 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2005 – July 31, 2005 | Monitoring, Repeat Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2004 – August 31, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 2004 – December 31, 2004 | Monitoring, Regular | Chromium | — | Resolved |
| November 1, 2002 – November 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 2002 – October 31, 2002 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2002 – September 30, 2002 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2002 – August 31, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2002 – June 30, 2002 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 2002 – April 30, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2002 – March 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 2002 – February 28, 2002 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 2002 – January 31, 2002 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 2001 – December 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 2001 – November 30, 2001 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2001 – October 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 2001 – September 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 2001 – August 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2001 – July 31, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 2001 – August 31, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| June 1, 2001 – June 30, 2001 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 2001 – March 31, 2001 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| October 1, 2000 – October 31, 2000 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| September 1, 2000 – September 30, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| July 1, 2000 – August 31, 2005 | Consumer Confidence Report Complete Failure to Report | Consumer Confidence Rule | — | Resolved |
| July 1, 2000 – July 31, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| May 1, 2000 – May 31, 2000 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| March 1, 2000 – March 31, 2000 | Maximum Contaminant Level Violation, Acute (TCR) | Coliform (TCR) | Health-based | Resolved |
| January 1, 2000 – December 31, 2000 | Monitoring, Regular | Nitrate | — | Resolved |
| December 1, 1999 – December 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 1999 – November 30, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 1999 – October 31, 1999 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1999 – October 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 1999 – September 30, 1999 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| September 1, 1999 – September 30, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 1999 – August 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 1999 – July 31, 1999 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1999 – July 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 1999 – June 30, 1999 | Maximum Contaminant Level Violation, Monthly (TCR) | Coliform (TCR) | Health-based | Resolved |
| June 1, 1999 – June 30, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 1999 – May 31, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1999 – May 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 1999 – April 30, 1999 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1999 – April 30, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 1999 – March 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 1999 – February 28, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 1999 – January 31, 1999 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Toluene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | CHLOROBENZENE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Ethylbenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Tetrachloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Styrene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1,2-Trichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Trichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2-Dichloropropane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Carbon tetrachloride | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1,1-Trichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2-Dichloroethane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | trans-1,2-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,1-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Vinyl chloride | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | p-Dichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | o-Dichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | DICHLOROMETHANE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Xylenes, Total | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | cis-1,2-Dichloroethylene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 1,2,4-Trichlorobenzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Benzene | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Arsenic | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 1999 – December 31, 1999 | Monitoring, Regular | Toxaphene | — | Resolved |
| December 1, 1998 – December 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| December 1, 1998 – December 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1998 – November 30, 1998 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1998 – November 30, 1998 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1998 – November 30, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 1998 – October 31, 1998 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1998 – October 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 1998 – September 30, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 1998 – September 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1998 – August 31, 1998 | Monitoring, Routine Minor (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1998 – August 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| July 1, 1998 – July 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1998 – July 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 1998 – June 30, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 1998 – June 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1998 – May 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 1998 – May 31, 1998 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1998 – April 30, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1998 – April 30, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 1998 – March 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1998 – March 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 1998 – February 28, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1998 – February 28, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 1998 – January 31, 1998 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 1998 – January 31, 1998 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Chlordane | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | ETHYLENE DIBROMIDE | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 1,2-DIBROMO-3-CHLOROPROPANE | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Total Polychlorinated Biphenyls (PCB) | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Pentachlorophenol | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Benzo(a)pyrene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | HEXACHLOROBENZENE | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 2,4,5-TP | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | 2,4-D | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Heptachlor epoxide | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Heptachlor | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | LASSO | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Atrazine | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Carbofuran | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Hexachlorocyclopentadiene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Dinoseb | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Picloram | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Di(2-ethylhexyl) phthalate | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Simazine | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | OXAMYL | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Di(2-ethylhexyl) adipate | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Glyphosate | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Endothall | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Diquat | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Dalapon | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Toxaphene | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Methoxychlor | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | BHC-GAMMA | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Endrin | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Thallium, Total | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Beryllium, Total | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Antimony, Total | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Nitrite | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | CYANIDE | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 1998 – December 31, 1998 | Monitoring, Regular | Arsenic | — | Resolved |
| December 1, 1997 – December 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1997 – December 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| November 1, 1997 – November 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1997 – November 30, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 1997 – October 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| October 1, 1997 – October 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1997 – September 30, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| September 1, 1997 – September 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1997 – August 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| August 1, 1997 – August 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1997 – July 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1997 – July 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| June 1, 1997 – June 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 1997 – June 30, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| May 1, 1997 – May 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1997 – May 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| April 1, 1997 – April 30, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1997 – April 30, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| March 1, 1997 – March 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1997 – March 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 1997 – February 28, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| February 1, 1997 – February 28, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1997 – January 31, 1997 | Monitoring of Treatment (SWTR-Filter) | Surface Water Treatment Rule | — | Resolved |
| January 1, 1997 – January 31, 1997 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| December 1, 1996 – December 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1996 – November 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1996 – October 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| September 1, 1996 – September 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1996 – August 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1996 – February 4, 2005 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| June 1, 1996 – June 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1996 – May 31, 1996 | Monitoring, Repeat Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1996 – April 30, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| March 1, 1996 – March 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| February 1, 1996 – February 29, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Asbestos | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Mercury | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Cadmium | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Nitrate-Nitrite | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Nitrate | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Barium | — | Resolved |
| January 1, 1996 – January 31, 1996 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Fluoride | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Selenium | — | Resolved |
| January 1, 1996 – February 4, 2005 | Initial Tap Sampling for Pb and Cu | Lead and Copper Rule | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Chromium | — | Resolved |
| January 1, 1996 – December 31, 1996 | Monitoring, Regular | Arsenic | — | Resolved |
| September 1, 1992 – September 30, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| August 1, 1992 – August 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| July 1, 1992 – July 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 1992 – June 30, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| May 1, 1992 – May 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| April 1, 1992 – April 30, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1992 – March 31, 1992 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1992 – March 23, 2007 | Failure to Filter (SWTR) | Surface Water Treatment Rule | Health-based | Resolved |
| December 1, 1991 – December 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| November 1, 1991 – November 30, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| October 1, 1991 – October 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| June 1, 1991 – June 30, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
| January 1, 1991 – January 31, 1991 | Monitoring, Routine Major (TCR) | Coliform (TCR) | — | Resolved |
Archived closed in EPA's records (typically due to age or a data correction)Resolved addressed and confirmed by the state
Enforcement actions
- January 28, 2026Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- December 9, 2025Federal Compliance achieved1 linked violation
- December 2, 2025Federal Violation/Reminder Notice1 linked violation
- November 18, 2025Federal Compliance achieved1 linked violation
- November 14, 2025Federal Compliance achieved1 linked violation
- September 16, 2025Federal Violation/Reminder Notice1 linked violation
- September 16, 2025Federal Violation/Reminder Notice1 linked violation
- August 20, 2025Federal Compliance achieved1 linked violation
- June 23, 2025Federal Compliance achieved1 linked violation
- June 23, 2025Federal Compliance achieved1 linked violation
- June 11, 2025Federal Violation/Reminder Notice1 linked violation
- June 11, 2025Federal Violation/Reminder Notice1 linked violation
- May 13, 2025Federal Compliance achieved1 linked violation
- March 5, 2025Federal Compliance achieved1 linked violation
- January 31, 2025Federal Compliance achieved2 linked violations
- December 12, 2024Federal Compliance achieved1 linked violation
- December 12, 2024Federal Compliance achieved1 linked violation
- December 10, 2024Federal Compliance achieved3 linked violations
- September 19, 2024Federal Compliance achieved2 linked violations
- September 19, 2024Federal Compliance achieved2 linked violations
- April 12, 2024Federal Compliance achieved1 linked violation
- April 5, 2024Federal Compliance achieved1 linked violation
- October 11, 2023Federal Compliance achieved2 linked violations
- October 6, 2023Federal Compliance achieved1 linked violation
- August 22, 2023Federal Compliance achieved1 linked violation
- April 10, 2023Federal Compliance achieved1 linked violation
- March 22, 2023Federal Compliance achieved2 linked violations
- October 19, 2020Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 25, 2019Federal Compliance achieved1 linked violation
- May 3, 2019Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 15, 2019Federal Compliance achieved1 linked violation
- December 31, 2016Federal Compliance achieved1 linked violation
- December 31, 2016Federal Compliance achieved1 linked violation
- November 28, 2015Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- July 31, 2015Federal Compliance achieved1 linked violation
- January 1, 2015Federal Compliance achieved1 linked violation
- January 1, 2015Federal Compliance achieved1 linked violation
- June 11, 2014Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- July 9, 2012Federal Compliance achieved1 linked violation
- September 21, 2011Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 20, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- June 29, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- May 31, 2011Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 14, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- April 13, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- March 9, 2011Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 22, 2011Federal Compliance achieved1 linked violation
- February 22, 2011Federal Compliance achieved1 linked violation
- January 24, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- January 11, 2011Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- December 21, 2010Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- December 13, 2010Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 15, 2010Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- July 15, 2010Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- May 21, 2010Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- April 14, 2010Federal Public Notification received from PWSgeneral compliance action — not tied to a specific violation on record
- February 26, 2010Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- December 18, 2009Federal Compliance achieved1 linked violation
- November 18, 2009Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- November 18, 2009Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- November 13, 2009Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- October 27, 2009Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- March 18, 2009Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- August 20, 2008Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- July 1, 2008Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- May 22, 2008Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- December 19, 2007Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achieved1 linked violation
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- March 23, 2007Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 21, 2006Federal Technical Assistance Visit1 linked violation
- August 17, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- July 18, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- June 14, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- June 14, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- February 27, 2006Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- November 29, 2005Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- August 31, 2005Federal Compliance achieved1 linked violation
- July 18, 2005Federal Technical Assistance Visitgeneral compliance action — not tied to a specific violation on record
- June 13, 2005Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 14, 2005Federal Violation/Reminder Noticegeneral compliance action — not tied to a specific violation on record
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achievedgeneral compliance action — not tied to a specific violation on record
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
- February 4, 2005Federal Compliance achieved1 linked violation
Contact
Yurok Tribe
7074821350
Klamath, CA 95548