Drinking Water Compliance OS

PINE RIDGE, 08

POTATO CREEK WATER SYSTEM Water System

Current status

No open violations on record as of July 4, 2026.

This system's next federally required Consumer Confidence Report is due July 1, 2027, under the EPA's revised reporting rule.

Data sourced from the EPA ECHO database (SDWA bulk download), last refreshed July 4, 2026. This is a record-keeping and public-information tool — it does not replace EPA Region 8’s official records. Always confirm current status with EPA Region 8 before making decisions based on this information.

System facts

System ID (PWSID)
084690472
System type
Community Water System
Population served
95
Service connections
19
Ownership
Native American tribal
Water source
surface water (rivers, lakes, or reservoirs)

Violation history

  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    January 1, 2025 – September 15, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    January 1, 2025 – September 15, 2025

    Resolved
  • Monitoring and Reporting (DBP)

    TTHM

    January 1, 2024 – December 31, 2024

    Resolved
  • Monitoring, Routine (RTCR)

    Revised Total Coliform Rule

    March 1, 2019 – March 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    September 1, 2018 – August 31, 2019

    Resolved
  • Monitoring and Reporting (DBP)

    Total Haloacetic Acids (HAA5)

    January 1, 2014 – December 31, 2014

    Resolved
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    January 1, 2011 – February 22, 2013

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Arsenic

    January 1, 2010 – March 31, 2010

    Resolved
  • Maximum Contaminant Level Violation, Monthly (TCR)

    Health-based

    Coliform (TCR)

    November 1, 2009 – November 30, 2009

    Resolved
  • Maximum Contaminant Level Violation, Average

    Health-based

    Arsenic

    October 1, 2009 – December 31, 2009

    Resolved
  • Initial Tap Sampling for Pb and Cu

    Lead and Copper Rule

    July 1, 2009 – January 25, 2010

    Resolved

Resolved addressed and confirmed by the state

Enforcement actions

Contact

ABOLD, ERNIE

605-867-5804

PINE RIDGE, SD 57770